The sewer lateral under your address, from the public record Β· public data, no accountπŸ“ž (970) 238-2885Check an address β†’
Sewer Line Record

Home β€Ί Lateral rules by region β€Ί San Mateo County

San Mateo County sewer lateral rules at sale, city by city

Several Peninsula cities make the seller deal with the sewer lateral before title transfers: South San Francisco, San Bruno and Burlingame require a city certificate or witnessed test, Millbrae requires a camera inspection to the city main, and San Mateo requires an inspection on sale. Belmont requires only a buyer notice at sale. The rules differ on age thresholds, test type and how long a pass lasts, so read your city's row.

The rules at a glance

One row per jurisdiction, each linked to the official page it comes from and dated. Every statement on this page is checked against a verbatim quote from that source; a statement we could not match to its source is left out rather than paraphrased.

JurisdictionTypeKey ruleSource
South San FranciscoRequired at saleA sewer lateral certificate of compliance is required before the property title transfers.South San Francisco, Point of Sale Ordinance Fact Sheet (checked 2026-09-23)
San BrunoRequired at saleHomes over 50 years old must have the lateral inspected and certified by the city before sale.City of San Bruno, Point of Sale Sewer Lateral Requirement (SBMC ch. 10.13) (checked 2026-09-23)
MillbraeRequired at saleBefore close of escrow, owners must run a CCTV inspection of the lateral from the building to the city main.City of Millbrae, Testing Sanitary Sewer Lateral Upon Transfer of Ownership (checked 2026-09-23)
BurlingameRequired at saleOn any transfer of a property with buildings more than 25 years old, the lateral must be tested for infiltration and repaired as needed.City of Burlingame, Sewer Lateral Test Ordinance 1329 (BMC ch. 15.12) (checked 2026-09-23)
San Mateo (city)Required at saleSan Mateo's ordinance has four triggers, and the sale of real property is one of them.City of San Mateo, 2020 Private Sewer Lateral Ordinance (SMMC 7.38.432) (checked 2026-09-23)
BelmontBuyer notice at saleAt sale, the seller must give prospective buyers a Notice to Buyers that homeowners are responsible for repairing and maintaining the private sewer lateral.City of Belmont, Sewer (Public Works) (checked 2026-09-23)
PacificaRepair programPacifica runs a Sewer Lateral Replacement Grant Program; its page lists applications for 2025-2026 and 2026-2027.City of Pacifica, Sewer Lateral Grant Program (checked 2026-09-23)

Why the Peninsula rules differ, and which difference matters to you

These ordinances all aim to keep groundwater out of the sewer mains, and they check for it in different ways. Burlingame and the East Bay-style programs pass or fail the lateral on a witnessed test. South San Francisco, San Bruno and Millbrae work from a camera video the city reviews. San Mateo triggers an inspection on sale and exempts a lateral fully replaced with a city sign-off in the past 25 years. What your contractor has to deliver depends on which city the house is in, so check the row before booking anyone.

Two things vary enough to change a seller's math. The first is which houses are caught at all: Burlingame applies to buildings more than 25 years old, San Bruno to homes over 50. The second is how long a pass lasts: in South San Francisco and Burlingame a full replacement is good for 25 years against 10 for a repair or a clean result, which is the real comparison behind a β€œjust patch it for the sale” quote.

Belmont works differently from its neighbors. A certificate is not required at sale; the seller instead gives buyers a notice that the private lateral is the owner's to repair and maintain. Belmont's certificate is triggered by larger property improvements (the threshold is in its row below) or by a change in water service. Pacifica, for its part, runs a lateral replacement grant program with yearly application rounds.

San Bruno wants the whole lateral from the structure to the city main on camera, Millbrae the same run, so a scope that stops at the property line will not satisfy either. Ask for the recording and keep it: it is also how you check what a repair or replacement should cost and whether the defect is on your side of the line.

Each jurisdiction, with the source language

Open a jurisdiction for its rules, each followed by the source's own words.

South San Francisco

  • A sewer lateral certificate of compliance is required before the property title transfers. β€œmust obtain a sewer lateral certificate of compliance prior to the transfer of the property title.” (South San Francisco, Point of Sale Ordinance Fact Sheet, checked 2026-09-23)
  • The city assesses a CCTV video recorded by any licensed contractor. β€œA Closed Circuit Television (CCTV) video performed by any licensed contractor is required to be submitted to the city for assessment of the sewer lateral.” (South San Francisco, Point of Sale Ordinance Fact Sheet, checked 2026-09-23)
  • A certificate is valid for 10 years if no repairs or only partial repairs were needed. β€œIf no repairs are required or partial repairs are performed to the sewer lateral, then the Compliance Certificate is valid for 10 years.” (South San Francisco, Point of Sale Ordinance Fact Sheet, checked 2026-09-23)
  • A certificate after full replacement is valid for 25 years. β€œIf replacement of the entire lateral was performed, then the Compliance Certificate is valid for 25 years.” (South San Francisco, Point of Sale Ordinance Fact Sheet, checked 2026-09-23)
  • A time extension of up to 180 days is available if the certificate can't be obtained before transfer. β€œIf a sewer lateral certificate of compliance cannot be obtained before the transfer of title, the property owner, agent, or buyer may apply for a time extension of up to 180 days to perform the inspection and necessary repairs to the lateral.” (South San Francisco, Point of Sale Ordinance Fact Sheet, checked 2026-09-23)

San Bruno

  • Homes over 50 years old must have the lateral inspected and certified by the city before sale. β€œIf your home is over 50 years old, your sewer lateral must be inspected and certified by the City before it is sold.” (City of San Bruno, Point of Sale Sewer Lateral Requirement (SBMC ch. 10.13), checked 2026-09-23)
  • Enforcement began May 8, 2015. β€œEffective May 8, 2015, the City of San Bruno will begin enforcement of a point-of-sale requirement for sewer lateral inspections.” (City of San Bruno, Point of Sale Sewer Lateral Requirement (SBMC ch. 10.13), checked 2026-09-23)
  • A certificate is required even if the property was never listed on the MLS, and for inter-family transfers. β€œYes, even if the property was never listed on the MLS it is required to obtain a Lateral Compliance Certificate. This also applies to inter-family transfers.” (City of San Bruno, Compliance Certificate FAQ, checked 2026-09-23)
  • The video must show the whole lateral from the structure to the connection at the city main. β€œShall show entire sewer lateral from the structure to the connection on the city’s main sewer.” (City of San Bruno, Compliance Certificate FAQ, checked 2026-09-23)
  • You can hire any person or company to make the video, but the video must meet the city's requirements to be acceptable. β€œNo, you can hire any person or company to perform the video but there are certain requirements that need to be met in order for the video to be acceptable.” (City of San Bruno, Compliance Certificate FAQ, checked 2026-09-23)
  • Condo units on a shared lateral don't need an individual certificate. β€œNo, An Individually-Owned Unit in a Multi-Unit Structure Served by a Single Lateral or Shared Laterals Such as a Condominium or Other Common Interest Development will not be required to obtain an individual Lateral Compliance Certificate.” (City of San Bruno, Compliance Certificate FAQ, checked 2026-09-23)

Millbrae

  • Before close of escrow, owners must run a CCTV inspection of the lateral from the building to the city main. β€œPrior to transfer of ownership (close of escrow), property owners must perform an inline closed circuit video inspection of their existing sanitary sewer lateral from the building to the City main per Millbrae Municipal Code, Section 8.20.” (City of Millbrae, Testing Sanitary Sewer Lateral Upon Transfer of Ownership, checked 2026-09-23)
  • A property with an active compliance certificate is exempt. β€œThe inspection is exempt if the property has an active compliance certificate.” (City of Millbrae, Testing Sanitary Sewer Lateral Upon Transfer of Ownership, checked 2026-09-23)
  • Millbrae offers a rebate on qualifying lateral upgrades: 20% of the cost, capped by the program. β€œRecently separated sanitary sewer laterals, sewer laterals that are required to upgrade to current City code, sewer laterals at risk of overflowing, and broken sewer laterals, may qualify for a rebate from the City in the amount of 20% of the total cost paid for the upgrade or up to $2,000.” (City of Millbrae, Testing Sanitary Sewer Lateral Upon Transfer of Ownership, checked 2026-09-23)

Burlingame

San Mateo (city)

  • San Mateo's ordinance has four triggers, and the sale of real property is one of them. β€œthe revised private sewer lateral ordinance has four event triggers that require a property to conduct a sewer lateral inspection per Municipal Code Section 7.38.432(c)(1): Sale of real property” (City of San Mateo, 2020 Private Sewer Lateral Ordinance (SMMC 7.38.432), checked 2026-09-23)
  • Building permits for additions, alterations or remodels to property valued at or above $90,000, as set by City Council resolution, are another trigger. β€œBuilding permits for additions, alterations, and/or remodel to property of valuation greater than or equal to $90,000 as set by City Council Resolution No.” (City of San Mateo, 2020 Private Sewer Lateral Ordinance (SMMC 7.38.432), checked 2026-09-23)
  • No new inspection is needed if one within the past 5 years needed no repairs, or its partial repairs were completed. β€œWithin the past 5 years, an inspection was performed that either (1) needed no repairs or (2) had required partial repairs which have subsequently been completed.” (City of San Mateo, 2020 Private Sewer Lateral Ordinance (SMMC 7.38.432), checked 2026-09-23)
  • A full replacement with final city sign-off within the past 25 years is also exempt. β€œWithin the past 25 years, a sewer lateral was completely replaced and received final sign off through a City permit.” (City of San Mateo, 2020 Private Sewer Lateral Ordinance (SMMC 7.38.432), checked 2026-09-23)
  • Work in the public right-of-way or at the city main needs an encroachment permit. β€œAny sewer lateral work in the Public Right-of-Way or involving the City's main will need an encroachment permit.” (City of San Mateo, 2020 Private Sewer Lateral Ordinance (SMMC 7.38.432), checked 2026-09-23)

Belmont

  • At sale, the seller must give prospective buyers a Notice to Buyers that homeowners are responsible for repairing and maintaining the private sewer lateral. β€œThe City requires a seller to provide prospective buyers with a "Notice to Buyers" advising them that homeowners are responsible for the repair and maintenance of the private sewer lateral.” (City of Belmont, Sewer (Public Works), checked 2026-09-23)
  • A Sewer Lateral Certificate is not required at time of sale. β€œA Sewer Lateral Certificate is not required at time of sale.” (City of Belmont, Sewer (Public Works), checked 2026-09-23)
  • A certificate is required for property improvements costing $200,000 or more, or work that changes water service, such as a second meter or a meter size change. β€œA Sewer Lateral Certificate is required if you are conducting improvements to your property costing $200,000 or more, or if there is work that causes a change in water service such as adding a second meter or changing the meter size.” (City of Belmont, Sewer (Public Works), checked 2026-09-23)
  • The city issues a certificate when the whole lateral was lawfully built in the past 15 years and is not suspected of needing repair, or when testing and inspection show it is in good condition. β€œThe City will issue a Sewer Lateral Certificate for a private sewer lateral in a state of good repair when: The entire sewer lateral has been lawfully constructed within the past 15 years and the City does not suspect that the sewer lateral is in need of repair, or the property owner has shown by testing and inspection to the City's satisfaction that the sewer lateral is in good condition.” (City of Belmont, Sewer (Public Works), checked 2026-09-23)

Pacifica

  • Pacifica runs a Sewer Lateral Replacement Grant Program; its page lists applications for 2025-2026 and 2026-2027. β€œ2025-2026 Sewer Lateral Replacement Program Application 2026-2027 Sewer Lateral Replacement Program Application” (City of Pacifica, Sewer Lateral Grant Program, checked 2026-09-23)
  • The 2024-2025 round ran until June 30, 2025, or until 100 laterals were replaced. β€œThe program will expire on June 30, 2025, or when 100 laterals are replaced.” (City of Pacifica, Sewer Lateral Grant Program, checked 2026-09-23)
  • The program requires the completed replacement with an invoice showing a zero balance due, meaning the contractor has been paid in full. β€œSewer lateral replacement completed, and must include an invoice showing a zero balance due, indicating that the contractor has been paid in full.” (City of Pacifica, Sewer Lateral Grant Program, checked 2026-09-23)
  • Pacifica also issues sewer lateral compliance certificates and keeps them on file; the city can confirm whether a property already has one. β€œNot sure if your property is already in compliance? Contact Doug Trade by email at traded@ci.pacifica.ca.us or by phone at (650) 738-7472 to see if there is already a certificate on file.” (City of Pacifica, Sewer Lateral Compliance Certificates, checked 2026-09-23)

What the soil does to a lateral here

The ordinance tells you what you have to prove; the ground tells you what you are likely to find. The USDA soil survey rates, for any address, how corrosive the soil is to iron and concrete pipe and how much it shrinks and swells, which is what cracks rigid clay joints. Enter the property address for the reading under it.

Check the soil under a San Mateo County address

USDA soil survey under the address: corrosivity to iron and steel pipe, shrink-swell movement, water table. No account required.

Usually 1–3 seconds. The USDA service occasionally takes longer.

Common questions

Which San Mateo County cities require a sewer lateral inspection when you sell?

Of the cities we have verified: South San Francisco, San Bruno (homes over 50 years old), Millbrae, Burlingame (buildings over 25 years old) and San Mateo. Belmont does not require a certificate at sale but requires a notice to buyers. Each rule, its trigger and its source are in the table above.

Is a camera video enough, or do I need a test?

It depends on the city. South San Francisco, San Bruno and Millbrae assess a video. Burlingame requires an infiltration test witnessed by a city representative.

How long does a South San Francisco sewer lateral certificate last?

Ten years if no repairs or only partial repairs were needed; 25 years if the entire lateral was replaced.

Can I close before the work is done?

South San Francisco allows a time extension of up to 180 days if the certificate cannot be obtained before transfer. Burlingame requires repairs to be completed and approved before title transfers.

Who pays for the inspection and repairs in a sale?

Burlingame leaves it to the parties to the sale. For the other cities, read the row for your city and settle it in the purchase contract.

Sewer Line Record is an independent reference built on public records and published sources. It is not an inspection, and nothing here states that a specific sewer line is failing, safe or code-compliant. Rules change; the linked source is the authority, not this page. Checked 2026-09-23.

Before you book the scope

Check which test your city accepts and how far the camera has to go, then compare repair and replacement against how long each certificate lasts.

Independent reference Β· no obligation.

What a call is for

  1. Read the quote or the camera verdict together. What was actually scoped, where the damage is, what method is being proposed β€” and whether you were given the footage.

  2. Read the public record. Soil corrosivity and shrink-swell under the address from the USDA survey, and whether your city makes the lateral your problem at all.

  3. Decide the next step. Sometimes a second camera scope from someone who does not sell repairs; sometimes a spot repair instead of a full dig; sometimes nothing.

Independent β€” no obligation.