The sewer lateral under your address, from the public record ยท public data, no account๐Ÿ“ž (970) 238-2885Check an address โ†’
Sewer Line Record

Home โ€บ Lateral rules by region

Sewer lateral inspection at sale and city repair programs

In a few places, selling a home requires a passed lateral test or a city-reviewed video before title can transfer. Others pay part of a lateral repair out of a fee on the tax bill. This register lists the 7 point-of-sale rules, 1 buyer-notice rule and 23 repair programs we have verified, each cited to its official source.

By region

RegionWhat appliesJurisdictions verified
East BayInspection or certificate required at saleEBMUD Regional PSL Ordinance, City of Berkeley PSL program
San Mateo CountyInspection or certificate required at saleSouth San Francisco, San Bruno, Millbrae, Burlingame, San Mateo, Belmont, Pacifica
St. LouisMunicipal repair programsMissouri law, City of St. Louis, St. Louis County, University City, Webster Groves, Maplewood, Ballwin, Hazelwood, Florissant, Richmond Heights, Kirkwood, Chesterfield, Ferguson, Bridgeton, Des Peres, Crestwood, Rock Hill, Manchester, Brentwood, Creve Coeur, Olivette, Overland

Each regional page carries the rule text for every jurisdiction, quoted from the source and dated with the day it was checked. We only publish a statement after matching it to a verbatim quote from the official page; statements that failed that check are held back, not paraphrased.

Two kinds of rule, and why they matter to a quote

Point-of-sale rules exist mostly to keep groundwater out of old sewer systems. The seller, or the buyer by agreement, has to prove the lateral is sound: a witnessed pressure or water test in some cities, a camera video the city reviews in others. The certificate that results lasts longer after a full replacement than after a repair, and that difference is the honest way to compare a spot-repair quote with a replacement quote under escrow pressure.

Repair programs work the other way. Nobody makes you fix anything, but when the lateral fails, the city pays part of the bill. The share, the cap and the exclusions are set city by city, and most programs have steps that must come first (cabling the line, a city inspection, approved bids). Skipping one can cost you the reimbursement.

Either way, start with where your responsibility for the pipe ends, which our who-pays page covers city by city. Then get camera footage you keep, and only then price the work.

Common questions

Do I need a sewer lateral inspection to sell my house?

Only where a local ordinance says so. The ones we have verified are in the Bay Area: every jurisdiction in EBMUD's regional program, Berkeley, and five San Mateo County cities. Where no ordinance applies, a sewer scope is a choice for the buyer, not a condition of closing.

What is a sewer lateral certificate of compliance?

A document the city or sewer agency issues once your lateral passes its test or video review. It is typically required before title transfers, and it lasts a fixed number of years that depends on whether the lateral was replaced or only repaired.

Will my city pay to fix my sewer lateral?

Some will pay part of it. In the St. Louis area most cities collect a small annual fee on the property tax bill and pay a share of a qualifying repair, each with its own cap and exclusions. A few Bay Area cities have narrower help: Berkeley offers interest-free loans to low-income owners in some cases, Millbrae a partial rebate on qualifying upgrades, and Pacifica a lateral replacement grant program.

My city isn't listed. How do I check?

Search your city's municipal code for 'sewer lateral', 'building sewer' or 'point of sale', and ask the public works or wastewater department two questions: is an inspection or certificate required when a home is sold, and is there a repair assistance program? Ask for the code section or program page in writing.

Sewer Line Record is an independent reference built on public records and published sources. It is not an inspection, and nothing here states that a specific sewer line is failing, safe or code-compliant.

Know the rule before you price the work

Whether the city requires a test, or will pay part of a repair, changes what a fair quote looks like.

Independent reference ยท no obligation.

What a call is for

  1. Read the quote or the camera verdict together. What was actually scoped, where the damage is, what method is being proposed โ€” and whether you were given the footage.

  2. Read the public record. Soil corrosivity and shrink-swell under the address from the USDA survey, and whether your city makes the lateral your problem at all.

  3. Decide the next step. Sometimes a second camera scope from someone who does not sell repairs; sometimes a spot repair instead of a full dig; sometimes nothing.

Independent โ€” no obligation.